Portfolio

Karrinyup Shopping Centre

Previous Next Karrinyup Shopping Centre Multiplex / AMP Capital The Karrinyup Shopping Centre Redevelopment involved an expansion from 59,874 square metres to 109,000 square metres. Completed during the Covid-19 Pandemic, Karrinyup was the largest commercial construction project in Western Australia for its duration. A brief overview of the basebuild Mechanical Services installed: – Total capacity […]

Karrinyup Shopping Centre Read More »

Inpatient Surge Facilities

Previous Next Previous Next Inpatient Surge Facilities Multiplex Complete mechanical services installation of the new modular expansion wards, designed to provide 120 additional beds across 4 separate hospitals in Western Australia in response to the COVID-19 Pandemic. The 4 hospitals included: – Osborne Park- Bentley- Rockingham- Bunbury Completed within a calendar year, the modular wards were designed to

Inpatient Surge Facilities Read More »

SJOG Subiaco Hospital

Previous Next SJOG Subiaco Hospital redevelopment Georgiou The first 2 stages of the SJOG Subiaco Hospital Redevelopment included: – A complete upgrade of the Hospital’s existing kitchen and an overhaul of the Mechanical Services Plant room above. This includes the provision of 5x AHU’s and the demolition and removal of redundant plant and equipment. –

SJOG Subiaco Hospital Read More »

Curtin University – Building 611

Previous Next Curtin University – Building 611 Hoskins Contracting The Curtin University Building 611 refurbishment involved the combination of a multitude of research facilities spread across the Curtin University campus into a single, fit for purpose research facility located in Technology Park. Over 2000m2 of laboratory space was refurbished to provide world class teaching and

Curtin University – Building 611 Read More »

Telethon Kids Institute

Previous Next Telethon Kids Institute Multiplex The Telethon Kids Institute, located on the QEII healthcare campus, is the largest centre of excellence in healthcare, research and education in the Southern Hemisphere. CMS were engaged for the provision of the complete Mechanical Services package across the 9,000m2 facility which includes 7,000m2 of working area and 2,000m2

Telethon Kids Institute Read More »

Zara Karrinyup

Previous Next Previous Next Zara Karrinyup Hoskins Contracting Provision of new Mechanical Services installation in a 3,000m2 tenancy at the new Karrinyup Shopping Centre. Working closely with a design team based at Zara’s head office in Spain, CMS were tasked to deliver additional cooling requirements to meet Zara’s global standard. Procurement of an additional Air Handling

Zara Karrinyup Read More »

QEII Central Energy Plant

Previous Next QEII Central Energy Plant Multiplex CMS Engineering undertook the complete central plant and ancillary mechanical services and distribution installation to supply chilled water, high temperature hot water and medical gases to the facilities within the Queen Elizabeth II Medical Centre Precinct, including the Sir Charles Gardiner Hospital, State Cancer Center and the new

QEII Central Energy Plant Read More »

Dowell Windows

Previous Next Dowell Windows Design & Construct Supply and installation of Mechanical Services for a new 10,000m2 factory in Perth. Factory floor area to be serviced by a combination of evaporative units and gas radiant heaters for cooling and heating respectively. The project also involved an office and laboratory fitout comprising of reverse cycle split

Dowell Windows Read More »

Claremont Quarter Shopping Centre

Previous Next Claremont Quarter Multiplex Claremont Quarter incorporates 30,000m2 of retail floor space over two floors with more than 140 retail stores and major tenants including Coles and David Jones. The development also features 77 stylish residential apartments. CMS undertook the complete mechanical services installation complete with central plant serving the retail zones and VRV

Claremont Quarter Shopping Centre Read More »

140 St George’s Terrace

Previous Next Previous Next 140 St George’s Terrace Hoskins Contracting Complete demolition, reinstatment and full floor fitout of the new Bechtel offices located at 140 St George’s Terrace in the Perth CBD. Involving a condensed ECI program,the project included a detailed dilapidation report and assistance in the new design of the tenancy, working alongside Hoskins Contracting

140 St George’s Terrace Read More »

Scroll to Top